Projects
Maintenance strategies for whole processing plants, an asset management system for a council’s structures, and the framework a restarting plant will run on. Each page sets out the scope, what was delivered and how.
- Processing plants
- Copper and nickel concentrators and a copper smelter
- Infrastructure
- 114 council bridges and major culverts
- Largest register
- About 17,500 plant items
- Clients in
- Australia, Africa and the Americas
Project case studies
Mining and mineral processing
Maintenance strategy and CMMS build for a copper concentrator
Copper concentrator, North-Western Province, Zambia
- About 4,300plant items in the whole-plant index
- About 5,700PM task lists in the process plant build by October 2025
- 2,260of those are inspection task lists
Mining and mineral processing
Maintenance strategy and asset hierarchy for a copper smelter
Copper smelter, North-Western Province, Zambia
- About 17,500plant items across ten process areas
- 44system groups given their own strategies
- 20 daysof field verification on site, September 2026
Mining and mineral processing
Greenfield maintenance strategy for a new nickel concentrator
Nickel concentrator, North-Western Province, Zambia
- About 7,400records in the strategy database
- 41existing strategy documents and OEM manuals reviewed
- April 2026strategy development on site
Local government
An asset management system for a council’s bridges and major culverts
Southern Queensland, Australia
- 114bridges and major culverts
- 12modules, from maturity assessment to the plan
- 20 yearscovered by the life-cycle cost model
Metals processing
Asset management framework and work management process for a plant restart
Gulf Coast, Texas, United States
- 9asset management elements defined
- 7work management sub-processes mapped
- 12deliverables, programmed over eight weeks
Also delivered
Smaller pieces of work in the same programmes.
- A second copper concentrator: milling asset register and pit pump strategies (2025).
- A mining mobile fleet: asset management plans for dozers, wheel loaders and wheel dozers (2025).
- A mine fuel farm: an asset register of about 3,200 items (2026).
- A copper operation in Central America: a strategy review tool (2026).
- A Queensland coal mine: a brake testing procedure for mobile equipment (2025).
- RPEQ certification of lifting jigs, support stands, pressure systems and processing machinery for Queensland fabricators and equipment suppliers.
Client work is described at the level the confidentiality arrangements for each engagement allow. References are available on request.
Speak to the engineer who will do the work
Pardus scopes every project in a discussion with Miguel Pengel, the principal engineer, and a written scope with the deliverables, the fee basis and the dates follows. Larger scopes are resourced with named specialists or delivered with a partner firm.