Metals processing
Asset management framework and work management process for a plant restart
The corporate asset management framework and the work management process a restarting metals plant will run on from its first day: the policy, the element definitions, the KPIs, the process maps, the governing standard and the training pack.
Representative photograph, not the project site
- 9asset management elements defined
- 7work management sub-processes mapped
- 12deliverables, programmed over eight weeks
The engagement
The plant
A single fixed plant recovering metals from spent catalyst, with an ERP and a CMMS already chosen.
What is being delivered
- The asset management policy and framework: element model, governance, framework RACI, life-cycle model and maturity targets, with a strategic asset management plan template.
- Nine element definitions: strategy and objectives; risk and criticality; capital projects, management of change and life cycle; maintenance strategy and tactics; work management; materials and spares; asset information and master data; reliability engineering and defect elimination; asset integrity and compliance.
- A KPI dictionary: every KPI with its definition, formula, source field, frequency, owner, target and the meeting that reviews it.
- The work management architecture: work order status model, priority matrix, work types, and failure and cause codes.
- Seven process maps with narratives and step-level RACIs, an information flow map and a data standard.
- A consolidated RACI and a role description for each work management role.
- The Work Management Standard: the governing document, with compliance checks a supervisor can apply.
- The operating rhythm: terms of reference, agenda and KPI pack for each review meeting.
- Interface requirements for the engineering contractor building the hierarchy and the maintenance strategies, so their output fits the system without redesign.
- An implementation roadmap, a leadership briefing and a training pack with a train-the-trainer session.
The rules the system was designed to
- Proportionate to the organisation: nine elements chosen from the 39 subjects of the asset management landscape.
- Two levels of ambition in one document: every requirement is marked as a restart minimum or a three-year target.
- Built on the systems the plant has: every process step names where it happens, and none needs a feature the tools lack.
- Every requirement has an owner and a measure: no requirement without a RACI entry, no KPI without a definition, a source and a meeting that reviews it.
The services behind this project
Asset management
A framework, plans and a work management process your people can run.
ISO 55001 certification
A clause-by-clause gap assessment and a plan to close the gaps.
More projects
Mining and mineral processing
Maintenance strategy and CMMS build for a copper concentrator
Copper concentrator, North-Western Province, Zambia
Mining and mineral processing
Maintenance strategy and asset hierarchy for a copper smelter
Copper smelter, North-Western Province, Zambia
Mining and mineral processing
Greenfield maintenance strategy for a new nickel concentrator
Nickel concentrator, North-Western Province, Zambia
Speak to the engineer who will do the work
Pardus scopes every project in a discussion with Miguel Pengel, the principal engineer, and a written scope with the deliverables, the fee basis and the dates follows. Larger scopes are resourced with named specialists or delivered with a partner firm.