A hydraulic excavator loading a haul truck in an open-cut mine
  1. Home
  2. Tools

Free reliability engineering tools

Five free tools for maintenance and reliability engineers: a Weibull calculator, a critical spares calculator, an optimal maintenance interval calculator, a jack-knife diagram tool and RAPTOR 7 for reliability block diagrams. The method behind each one is explained on its page.

Calculators and software

Weibull calculator

Fits a Weibull distribution to failure data, with suspensions, and draws four plots with 95% confidence bounds.

Needs: Times to failure, and times of units removed without failing.

How it works   Use the tool

Critical spares calculator

How many spares to hold: by service level, by lowest total cost, as a reorder point, as an insurance spare and by ABC/VED priority.

Needs: Fleet size, operating hours, and MTBF or Weibull parameters.

How it works   Use the tool

Maintenance interval calculator

The replacement interval with the lowest cost per operating hour.

Needs: Weibull shape and scale, the planned cost and the failure cost.

How it works   Use the tool

Jack-knife diagram

Sorts downtime into chronic and acute failures, with a PNG of the diagram and a CSV of the table.

Needs: Failure codes, counts and mean time to repair.

How it works   Use the tool

RAPTOR 7

Models a system as a reliability block diagram and simulates its availability. The free edition takes up to 10 blocks.

Needs: The system’s blocks and their failure and repair data.

How it works   Open the tool

Excel templates

The same methods as spreadsheets you keep: Weibull, jack-knife and spares templates with step-by-step guides.

Templates and study guides

How the tools fit together

Fit the failure data, set the interval, size the spares, then rank what is left of the downtime.

1510305063.290991,0002,0005,00010,00020,000η = 7,849 hβ = 2.03Operating hours at failureCumulative failures, %
The slope says how it fails. β above 1 is wear-out, so the part is changed on a schedule. Example points about the fitted line from the Weibull article.
051015202502,0004,0006,0008,000Lowest cost: 3,500 hplannedfailurestotalReplacement interval, hoursCost per operating hour, $
The cheapest interval is not the MTBF. Hydraulic cylinder, β 2.03 and η 7,849 h, with example costs of $20,000 planned and $123,000 on failure.
51020501001251020Acute and chronicAcuteChronicMotorHydraulicsBrakesTyresElectricalBucketTransmissionCabNumber of failuresMean time to repair, hours
Frequent and slow to fix comes first. A Pareto chart ranks by downtime alone; this shows which failures are both. Example data.
Miguel Pengel, principal engineer, Pardus Consulting

Built by a practising engineering firm

The tools use the same methods Pardus applies on client work. When the question is bigger than a calculator, the analysis is run on your own CMMS data and signed by a registered professional engineer.

Discuss your project About Pardus

Discuss a project with Pardus.

Outline the plant, the assets or the question. An engineer will make contact to arrange a scoping discussion, and a written proposal follows once the scope is agreed.