Maintenance strategy and asset hierarchy for a copper smelter

An asset hierarchy of about 17,500 plant items and the maintenance strategies for a copper smelter, delivered in phases: primary smelting first, then secondary smelting, then utilities.

Representative photograph, not the project site

  • About 17,500plant items across ten process areas
  • 44system groups given their own strategies
  • 20 daysof field verification on site, September 2026

The engagement

Client
Copper mining operator
Where
Copper smelter, North-Western Province, Zambia
When
July 2026 to present In progress
Delivery
Delivered in partnership with a specialist maintenance consultancy
Services
Maintenance strategy, Asset hierarchy and CMMS master data

The plant

Isasmelt furnace and matte settling electric furnace, Peirce-Smith and IsaConvert converting, fire refining and anode casting, the acid plant, the oxygen plant, feed preparation and materials handling, and utilities.

What is being delivered

  • Scope definition and estimate from the CMMS register export: about 17,500 plant items across ten process areas, 865 asset-level items and 44 system groups needing their own strategies.
  • The asset hierarchy and plant index, built from P&IDs and process flow diagrams.
  • Draft maintenance strategies, then twenty days of field verification and strategy development on site in September 2026.
  • Phased delivery: primary smelting, then secondary smelting, then utilities and services.
  • A review of the site’s existing library of about 29,000 PM task records for what can be reused.

Outputs

  • The asset management plan for the smelter.
  • FMECAs and defined maintenance strategies in OnPlan.
  • PM inspection and component change-out activities.
  • Master data load sheets for the CMMS.
  • Up to 110 service sheets and work instructions.

The services behind this project

Maintenance strategy

Task lists, intervals and spares in the format your CMMS loads.

Asset hierarchy and CMMS master data

A plant index, an ISO 14224 hierarchy and validated load sheets.

Miguel Pengel, principal engineer, Pardus Consulting

Speak to the engineer who will do the work

Pardus scopes every project in a discussion with Miguel Pengel, the principal engineer, and a written scope with the deliverables, the fee basis and the dates follows. Larger scopes are resourced with named specialists or delivered with a partner firm.

Discuss your project About Pardus

Discuss a project with Pardus.

Outline the plant, the assets or the question. An engineer will make contact to arrange a scoping discussion, and a written proposal follows once the scope is agreed.