Local government
An asset management system for a council’s bridges and major culverts
A complete, working asset management system for the structures that carry a region’s roads over creeks, rivers and floodways, brought together in a five-year asset management plan for council to adopt.
Representative photograph, not the project site
- 114bridges and major culverts
- 12modules, from maturity assessment to the plan
- 20 yearscovered by the life-cycle cost model
The engagement
The twelve modules
- Gap analysis and maturity assessment against the International Infrastructure Management Manual.
- Data enablement and cleansing: one asset register for the structures.
- A condition assessment framework: how structures are inspected, rated and escalated.
- Five-year maintenance plans.
- Life-cycle costing and financial integration, with a 20-year model.
- Levels of service and performance measures.
- A risk management framework and criticality ranking, to ISO 31000.
- Renewal planning and capital prioritisation.
- An improvement plan and roadmap.
- Process maps and standard operating procedures.
- Organisational structure and RACI.
- The five-year asset management plan, which brings the other eleven together.
How it was assured
- Sixty-five deliverables across the twelve modules.
- Every workbook open and editable, with no passwords and no hidden calculations, so council staff can run the tools without a consultant.
- Every headline figure recomputed from the deliverable’s own register or model and traced to the council source file it came from.
- A validation week with council staff before anything was issued as final, then training and handover.
The services behind this project
Infrastructure asset management
An adoptable plan, a renewal forecast and models your staff can run.
Asset management
A framework, plans and a work management process your people can run.
More projects
Mining and mineral processing
Maintenance strategy and CMMS build for a copper concentrator
Copper concentrator, North-Western Province, Zambia
Mining and mineral processing
Maintenance strategy and asset hierarchy for a copper smelter
Copper smelter, North-Western Province, Zambia
Mining and mineral processing
Greenfield maintenance strategy for a new nickel concentrator
Nickel concentrator, North-Western Province, Zambia
Speak to the engineer who will do the work
Pardus scopes every project in a discussion with Miguel Pengel, the principal engineer, and a written scope with the deliverables, the fee basis and the dates follows. Larger scopes are resourced with named specialists or delivered with a partner firm.